Find your next community solar site in 90 minutes, not 90 days.

Platt unifies every NY utility's hosting capacity, the SIR queue, environmental constraints, zoning, and the VDER value stack into a transparent 0–100 screen per parcel: a ranked shortlist of what to look at first, with cited diligence reports your lender can defend.

☉ GHI1000 W/m²FIXED-TILT ARRAY · 4.2 MWdcPLATT.ENERGYIRRADIANCE MODELFIG.02 · β 30° · 1000 W/m²
WHAT MAKES PLATT DIFFERENT
FEEDER · CITED · MULTI-IOU

Three things no other tool does for community solar.

◆ 01 · TOPOLOGY
Distribution-feeder-deep.
Other tools stop at the substation snapshot. Platt models hosting capacity and queue pressure at the feeder level, including ConEd secondary-network rules.
NMP-3845115 / 13.2 kVF-A · 3.2 MWF-B · 5.0 MWF-C · gatedFEEDER-LEVEL HC · LIVE3 feeders / 1 substation
◆ 02 · DILIGENCE
Cited diligence in 28 s.
Lender-grade PDFs with every number sourced. The agent calls 11 tools, you get a footnoted report.
query_parcels127 rows0.8s
get_hosting_capacity8.2 MW1.1s
get_sir_queue2 ahead0.4s
compute_buildable38.2 ac2.3s
resolve_ahjCamillus0.6s
estimate_value_stack$84/MWh1.0s
draft_narrativeSonnet 4.69.2s
14 CITATIONS · HIGH CONFIDENCE28.0s
◆ 03 · COVERAGE
All six NY IOUs. Quarterly.
Con Ed · NYSEG · RG&E · National Grid · Central Hudson · O&R. Refreshed every quarter from the JU HC portal and SIR queue.
115 kV69 kVCAMILLUSMARCELLUSMANLIUSLAFAYETTEOTISCO LAKESKANEATELES LAKENMP-38458.2 MWONE-40125.7 MWSYR-74.1 MWN01 mi2 miPLATT / NY GRID ATLASONONDAGA COUNTY, NYPROJECTION EPSG:26918 / UTM 18N
NMP
NYS
RGE
CED
CHE
O&R
NEXT REFRESH · 2026-08-15 · Q3
HOW IT WORKS
MEDIAN TIME · 6 MIN
FIRST DILIGENCE · 28 SEC

Three steps from county to lender-ready report.

STEP 01
~30 s
Pick a county.
Pre-screened catalogue · 1,200+ candidate parcels per county.
Onondaga62 COUNTIES
Onondaga1,247 parcels
Albany892 parcels
Monroe1,108 parcels
1 OF 62 SELECTED
STEP 02
instant
We rank every parcel.
Eight inputs · one transparent 0–100 screen. Built to rank what to look at first, not to predict interconnection outcomes.
#SCOREPARCELHC TREND
187057-12-04.1
285057-12-04.2
381062-08-11
478081-03-22
576045-19-07.1
TOP 5 OF 1,247SORT BY SCORE ↓
STEP 03
28 s · $0.27
Generate diligence.
12-section, citation-grade PDF · ready for the lender.
● DILIGENCE REPORTv0.5
87
PARCEL
057-12-04.1
Town of Camillus,
Onondaga County, NY
12 PAGES · 14 SOURCES
01──→02──→03
Pick a county · screen 1,200 parcels in 6 minutes · hand the lender a 12-page PDF.
METHODOLOGY
Our scoring methodology is fully published: weights, validation results, known limitations. Read it before you trust it.
VDER VALUE STACK$/MWH
$84/MWh
ENERGY LBMP$42
CAPACITY ICAP$12
ENVIRONMENTAL$9
DRV$8
LSRV$11
COMMUNITY$2
How the VDER value stack adds up to a compensation rate, per NMP-3845, May 2026.
PRICING

Three tiers. Annual contracts.

ATLAS
Private previewinvite required
COVERS · 6 IOU TERRITORIES
NMP
NYS
RGE
CED
CHE
O&R
  • Browse every county page
  • Top-50 parcels per county
  • Single-parcel detail view
  • Methodology + sources
  • Read-only MCP accessPLANNED
PRO
$1,500/ seat / month
COVERS · 6 IOU TERRITORIES
NMP
NYS
RGE
CED
CHE
O&R
  • Unlimited parcel views
  • 50 diligence reports / month
  • Bulk screening up to 100 parcelsPLANNED
  • Saved searches + alertsPLANNED
  • MCP token, moderate ratePLANNED
TEAM
$5,000/ month · 5 seats
COVERS · 6 IOU TERRITORIES
NMP
NYS
RGE
CED
CHE
O&R
  • Everything in Pro
  • 500 diligence reports / month
  • Bulk up to 1,000 parcelsPLANNED
  • REST API accessPLANNED
  • Custom AHJ list ingestionPLANNED